Diamante Luxury Homes offers cutting edge, professional design and planning along with the finest quality home construction services. Our simplified approach makes building your new home an enjoyable and seamless process. Outlined below is the typical progression of our Design & Build phases.
Phase I: Design Services
To begin designing your new home, bring photos, sketches, or magazine cut-outs that reflect your vision. We’ll gather essential details like room requirements, square footage, and your budget (“The Target”) to create a space that fits your personality and lifestyle perfectly.
Site surveys provide crucial data for our design team, whether on your property or ours, including topography and tree locations. Preliminary design involves site visits, research on building codes and zoning laws, and consultations to ensure project feasibility and address all desired elements in the new home’s preliminary sketch, guided by the Project Vision Meeting.
During schematic design, design and budget parameters are set, and the client’s functional and aesthetic goals are defined. Preliminary design aims to propose solutions that align with these goals, often depicted through sketches or AutoCAD drawings.
Initial sketching and drawings involve creating floor plans that include all desired elements of the home, such as bedrooms and outdoor living areas, followed by an initial floor plan review.
At this stage, initial hand drawings of the front elevation or façade are created and integrated with the floor plan, followed by revisions to both the front elevation and floor plan for further refinement.
At this point, three or four floor plan versions and two revised front elevation selections have been created in AutoCAD, nearing their final versions. A project cost estimate is then presented to the buyer based on these finalized plans.
Project specifications are detailed and include material allowances, enabling the buyer to select cabinets, windows, countertops, fixtures, and more for the house. Clients can revise their selections before moving to the next phase.
Phase 2: Construction
Upon signing the construction contract and making the down payment, plans are submitted to local agencies and HOA for approval. Once approvals are secured, the Interim Construction Loan is closed with the bank.
Groundbreaking marks the start of construction, while the buyer, assisted by an interior designer, selects paint colors, stone, tile, marble, and other materials. Throughout significant stages like Foundation, Framing, Drywall, Trim & Fixtures, scheduled meetings allow the buyer to oversee progress and offer input.
Following construction completion, all phases are inspected for code compliance. During the final walk-through, the builder and buyer ensure all details are finalized to satisfaction. The process concludes with the permanent mortgage loan closing, paying off the interim construction loan, and enabling the buyer to move into their new home.